Configuring a single-phase load control system with photovoltaic production

The video explains how to do the work necessary to: set the anti-blackout function on 4 loads, view the total instantaneous consumption of the system, view the single instantaneous consumption of 5 loads (4 read directly via actuator and 1 via a probe connected to a free output of the load control), view the instantaneous production of the photovoltaic system, enable the activation of a load to aid self-consumption, configure the load control for consumption of single-phase and photovoltaic with remote production, create 4 command groups to which then pair the cut-off priorities,  pair the cut-off thresholds (S1 and S2) according to determined priorities, create the group for self-consumption and configure the production threshold that triggers it.