Configuring a three-phase load control system with photovoltaic production

The video explains how to do the work necessary to: set the anti-blackout function on 4 loads (3 x 01851.2 outputs and 1 x 01456 output), view the total instantaneous consumption of the system, view the instantaneous consumption of a single load, view the instantaneous production of the photovoltaic system, activate a load to aid self-consumption, set the alarm on abnormal load power draw, set the ground fault alarm (residual current), and view the consumption of non-electric quantities (water and gas).

logo di youtube

Published on