Set Threshold-1 equal to the rated power of the counter contract, plus 10%. Set Threshold-2 equal to Threshold-1 plus 20% of the same Threshold-1. Set the Threshold Time to 90 minutes. For a 3KW contract therefore it will be Threshold-1=3.3KW, Threshold-2=4KW, Threshold Time=90 min. However, the valuesmust always be verified according to the conditions stated by the service provider.
It is also possible to define the priority of disconnection the configured loads (Max 16) or decide to always leave them On or Off (forcing). All of these parameters can be set by the By-me control panel in the Setup menu in the "Load Control" section as well as the override mode that can be automatic or manual.